Friday, October 13, 2006

 

[Tp_Cd] Digital Jiuzhai 2

The artical is a brief translation of gov's post discribing Digital Jiuzhai, and gave a solid and complete answer to my question of Digital Jiuzhai 1.

The intent of the change start from 1985, after 18 years planing, the greate project of Digital Jiuzhai is completely confirmed by gov. and start to carry out in 2000, which including a short term goal and long term goal, the formmer start from 2000 to 2005, and the latter will be finished in 2020. The cost has reaching 62 million till now. It's not hard to find how firm the desition has made by the gov..

Of all measurement made, I select severial important :
1.Fix the plank road more than 60KM built along a cliff

2.Build the Nuorilang Service Center within 360000 squire meter.

3.Green biological toilet

4.Intellectual contsruction. The source of material of building shall not from local.

5.Reconstruct road of 38 KM which accoding to "minimize the distroy and maxmize the recovery".

6.Build the biological enviroment. Including pulling down all the trading houses of residents about 100 thousand meter square, and recovery back to greenland.

7.Build 4 atmosphere station and 5 protecting station .

8.Redusing the mountain geography disaster.


More pain more gain.

I can feel the proudness of the guide of Jiuzhai now. And I also feel proud of china, who posses such a beautiful place and protect it so well. Not easy at all.

plank road built along a cliff



Comments: Post a Comment



<< Home

This page is powered by Blogger. Isn't yours?